The constructor awarded the bid to clean/ repair the Compton Drainage Ditch will be taking advantage of the weather conditions and will begin the project on Sunday February 2, 2025. Please avoid the northern boundary common area until further notice. Please find a new route for your children to travel to school until the project is complete.
The general Scope of Work for the Cottonwood Detention Facility & Compton Drain will include but may not be limited to the following:
- Removal and Disposal of all material obstructing the flow of the drain in the detention area as well as in the open Compton ditch.
- Jetting and Cleaning 1,200 LF of 15” HDPE Pipe
- Exposing and Cleaning +/- 13 Pipe Inlets & Grates
- Cleaning 36” Concrete Manhole.
- Clearing and Cleaning of +/-80’ of 36” Culvert.
- Rechanneling of the facility.
- Refurbish/Rebuild Pedestrian-Bike Paths Damaged by Erosion and/or Construction.
- Replace property damaged during construction, i.e., Landscaping, Irrigation, Fences, etc.
- Install Rip/Rap Erosion control around the east pipe inlet.
- Stormwater Management/Erosion Control